| Client |
Project Name |
Description |
| AECI |
Southgate Industrial Park (47 Ha) |
- Design of bulk earthworks and material management (1,6million
m3).
- Design of infrastructural roads, stormwater and sewer
reticulation.
- Contract administration & supervision.
|
| |
| Mashatu Nature Reserve (Pty) Ltd |
Limpopo Valley Airfield |
- Design of asphalt paved airfield (Category 3C, Length
1500 metres).
- Contract administration & supervision.
|
| |
| Condev |
Orient Club Township |
- Design and supervision of civil engineering infrastructure
for 450 sites, including roads, stormwater, sewer and water
reticulation.
|
| |
| Grinaker Projects |
Northgate Industrial Park |
- Design and supervision of civil infrastructure for 10
Ha industrial park.
|
| |
| Innova |
Riverdene Township |
- Design and supervision of civil infrastructure for 1000
house township in steep terrain, including roads, stormwater,
sewer and water reticulation.
|
| |
| CMDA |
Chesterville Bond Housing Phase 1 – 4 |
- Design and supervision of civil engineering infrastructure
to 930 residential stands – roads, stormwater, sewer reticulation
and house platforms in very steep terrain.
|
| |
| CMDA |
Freeway Slopes |
- Civil engineering infrastructure to 1000 residential sites.
Roads, stormwater, sewer reticulation, outfall sewers and
house platforms in steep terrain.
|
| |
| Assmang Manganese |
Smelter Complex, Cato Ridge |
- Concrete roads for heavy industrial use in a smelter complex
including relocation of services.
- Two hazardous waste lagoons comprising earth embankments,
clay and HDPE liners, hyson cell concrete protection layers,
inlet and outlet works, and pipework.
- 3km long upstream cutoff drain, including bulk earthworks,
concrete lining, culverts and ancillary works including
HDPE lined sump and pipework.
|
| |
| SANRAL |
N6 Aliwal North |
- Design rehabilitation and upgrading of 10km of national
road including bulk and restricted earthworks, layerworks,
culverts and traffic accommodation.
|
| |
| SANRAL |
N2 : Mariedal-Pongola |
- Routine road maintenance of 300km of N2 national road
for 30 months.
|
| |
| Afrox |
Maxmead Depot |
- Upgrade and expand depot, including hardstandings, new
gas filing dock, walls and fire reticulation in a hazardous
environment.
|
| |
| Engen |
Wentworth Depot |
- New tanker workshop comprising structural steel, steel
pipe bridge, concrete works and hardstanding, road layerworks
in a petroleum refinery.
|
| |
| Engen |
Wenthworth Depot |
- Design of new tanker terminal including concrete road,
tank foundations, loading platforms.
|